This system is designed to:Analyze coke yield, chemical product yield, and gas yield of blended or single coal types
Quantitatively simulate hot-strength indices (CRI, CSR) of coke
Support experimental research on both conventional and stamp-charging coking processes
Applications:Provide data for optimizing coal resource utilization and improving coke quality
Guide production improvements and evaluate economic feasibility
Support rational coal resource management through predictive modeling
This translation emphasizes technical functionality while maintaining clarity. Let me know if you'd like to adjust any terminology!...
Main Body of the 40kg Bottom-Loading Coke Oven Equipment:
Coal Charging Amount: 43-50kg (dry basis)
Effective Size of the Carbonization Chamber (Length × Width × Height): 500×400×600mm
There are 2 groups of silicon carbide rods for heating on each side of the combustion chamber.
Coking Time: 16h-24h (controlled at 22h during normal tests)
Flue Temperature: 1050℃±10℃ (rated maximum temperature is 1350℃)
Central Temperature of the Coke Cake: ≥950℃
Main Control System
Working Voltage: 380V±10%
Total Power: 24kw
Control System:
Components: Computer, Siemens PLC, 200_Smart;
Data Processing: Remotely controlled by the computer, the temperature control curve is displayed in real time, and data reports are output;
Computer: Lenovo brand
Printer: HP laser printer
Stamping Machine:
Purpose: Used to adjust the density of the coal charged into the oven.
Stamping Density: 0.72 tons/m³ - 1.03 tons/m³
Stamping Stroke Height: 600mm
Working Voltage: 220V±10%
Coal Charging and Coke Discharging System:
The lifting height of the lifting system is 700mm to protect the furnace body. Mechanical charging and discharging of the furnace are safe and convenient to operate.